Live Support
Live Support
Offline
Courses

Gas Turbine - LMS100: Gas Turbine - LMS100 Level 2 Cold Maintenance

Course Schedule

Location:  Houston, TX

Location
Start Date
Status
TXOctober 21-29, 2019 (Excluding Saturdays and Sundays)

Course Description

O-AER10403

Gas Turbine - LMS100 Level 2 Cold Maintenance 

This course provides the skills necessary to perform Level 2 Cold Maintenance on the LMS100 gas turbine.  In addition to classroom instruction, the course also includes hands-on maintenance such as removal, inspection, and replacement of internal parts.

Duration

7 Days

Target Audience

  • Supervisors
  • Mechanical Maintenance

Prerequisites

Participants must have:

  • Instruction is given in English; therefore, a reasonable ability to read and understand spoken English is required.
  • Reasonable computer skills
  • Basic understanding of your gas turbine or completion of the LMS100 Engine Familiarization course is highly recommended, as well as, reasonable level of mechanical skill and use of hand tools is required

Class Size

Maximum number of students:  8

Learning Objectives

This course will provide basic knowledge on the following:

  • Removal of variable inlet guide vane
  • Stage 0 blade replacement
  • Removal and re-installation of LP compressor
  • Replacement of #1 air / oil seal
  • LP compressor stage 1-3 blade replacement
  • LP compressor stage 0-3 vane replacement
  • Removal and re-installation of HP compressor upper case
  • HP compressor stage blade replacement
  • HP compressor stage vane replacement

Course Content

INTRODUCTION

  1. Instructor Background
  2. Participant Background
  3. Course Schedule

LESSON 1

  1. Use of applicable Operation and Maintenance manuals
  2. Removal, inspection and installation of internal engine components including:
    1. Starter/clutch assembly
    2. Radial drive shaft 
    3. Accessory gearbox 

LESSON 2

  1. Removal, inspection and installation of the HP compressor top case
  2. Removal, inspection and installation of stage 1 rotor blades
  3. Removal, inspection and installation of stage 2 rotor blades
  4. Removal, inspection and installation of 3 to 14 rotor blades

LESSON 3

      A.Removal, inspection and installation of the HP compressor top case

B.Removal, inspection and installation of stage 1 rotor blades

C.Removal, inspection and installation of stage 2 rotor blades

D.Removal, inspection and installation of stage 3 to 14 rotor blades

LESSON 4

A.Removal, inspection and installation of IGV-stage 2 shrouds

B.Removal, inspection and installation of IGV-stage 2 vanes

C.Removal, inspection and installation of stage 3-13 vanes

Please click on the link below for location information including directions, area hotels, and PPE requirements: 

Information Guide to Houston