Live Support
Live Support
Offline
Courses

Gas Turbine - LM6000: Gas Turbine -LM6000 Level 2 Hot Maintenance

Course Schedule

Location :  Houston, TX

Location
Start Date
Status
TXSeptember 30 (2019), October 01,02,03,04,07,08 (2019)
TXDecember 11,12,13,14,15,16,17,18,19 (2019)
TXJanuary 30,31 (2020), February 03,04,05,06,07 (2020)
TXJune 15,16,17,18,19,22,23 (2020)
TXSeptember 28,29,30 (2020), October 01,02,05,06 (2020)
TXDecember 09,10,11,14,15,16,17 (2020)

Course Description

O-AER10305

Gas Turbine - LM6000 Level 2 Hot Maintenance 

LM6k aero gas turbine

Instruction is designed so technical personnel responsible for the hands- on maintenance of the LM6000 will benefit most from this training. Scope of training focuses on selected Level 2 procedures identified in the applicable Operation and Maintenance manual.

This course is intended for customers who want to expand their on-site maintenance capabilities to include internal repairs of the GE LM6000 Aeroderivative gas turbine.

Duration

7 Days

Target Audience

  • Supervisors
  • Mechanical Maintenance

Prerequisites

  • Instruction is given in English; therefore, a reasonable ability to read and understand spoken English is required.
  • A basic understanding of your gas turbine or completion of the LM6000 Engine Familiarization course is highly recommended, as well as a reasonable level of mechanical skill and use of hand tools is required.

Class Size

Maximum number of students:  8

Learning Objectives

This course will provide basic knowledge on the following:

  • Removal of LP turbine
  • Removal of HP turbine
  • Removal of stage 1 nozzle
  • Removal of combustor
  • Removal of #5 bearing and inner race
  • Replacement of stage 2 HP turbine nozzle
  • Re-installation of combustor, stage 1 nozzle, HP turbine and LP turbine

Course Content

INTRODUCTION

  1. Instructor Background
  2. Participant Background
  3. Course Schedule

LESSON 1 - 2

  1. Course overview /content 
  2. Training Manual review 
  3. Removal Low Pressure Turbine 

LESSON  3

  1. Removal High Pressure Turbine Module 
  2. Removal Stage 1 Nozzle Module 
  3. Removal Combustor Module 

LESSON 4

  1. Remove No.5 bearing inner race 
  2. Remove No.5 bearing
  3. Stage 2 High Pressure Turbine Nozzle Replacement

LESSON 5

  1. Installation Combustor Module 
  2. Installation Stage 1 Nozzle Module 

LESSON 6

  1. Installation High Pressure Turbine Module

LESSON 7

  1. Installation Low Pressure Turbine Module

 

Please click on the following link for location information including directions, area hotels, and PPE requirements: 

Information Guide to Houston